Aluminum smelters are faced with the problem of maximizing efficiency and potline up time, despite wear and tear on various components of their smelting equipment.
Jesse Engineering Co. in Tacoma, Washington was hired as the primary contractor to design and build a Passenger Boarding Gangway system that would facilitate the loading and unloading of cruise ships at the Port of Seattle.