Aluminum smelters are faced with the problem of maximizing efficiency and potline up time, despite wear and tear on various components of their smelting equipment. |
Renewable energy is one of the hottest topics today, and one of the main priorities of the country. |
Jesse Engineering Co. in Tacoma, Washington was hired as the primary contractor to design and build a Passenger Boarding Gangway system that would facilitate the loading and unloading of cruise ships at the Port of Seattle. |
Compared to residential construction, log homes present many unique challenges. One of these are the jacks used for leveling. |
More than a table, this work of art constructed of steel, wood and glass, spans ten feet and elevates twelve inches with the turn of a ship’s wheel. |
|